Skip to content
pinbase
Review and sign-off

Corrections against a version. Sign-off on the record.

Work moves from the field to drafting to the surveyor’s desk with every version kept. Corrections attach to the version they were made on, and licensed sign-off is logged with who signed, when, and which version.

What you can do

  1. A drafting queue fed by the field

    When the crew marks a visit ready, the job lands in drafting with the raw files, photos and field sketch already attached.

  2. Corrections that stay attached

    Mark up a version, assign the correction, and see it closed in the next one. No more matching PDFs to email threads.

  3. Licensed sign-off log

    Only licensed surveyors can sign. Pinbase records the signer, their licence number, the version and the time, and locks that version.

  4. Sketch, cleanup and plan side by side

    Compare the raw field sketch, the cleaned-up drawing and the plan. The cleaned sketch is a draft; geometry still comes from the observations.

WHAT IT REPLACES

Marked-up PDFs over email, and file names that end in _v3_FINAL_rev2.

See everything Pinbase replaces

See it with your own parcels.

Book a demo and we’ll walk through it with a copy of your own job spreadsheet loaded.